This is a test page created for the purpose of seeing if I can add a link to a page
* Where in the Joint Commission PMS Listing Requirements is Jennifer's job?
|
ATTRIBUTE 2: Data Collection and Receipt -Refers to the operational characteristics of measurement systems. |
| 2A The measurement system will provide The Joint Commission with a standard copy or WebEx?
presentation of their core/ core test measure-related data collection tool and user’s guide upon request at any time.
Issues identified by The Joint Commission review require prompt resolution within mutually agreed
upon timeframes. Other than The Joint Commission required changes (e.g., algorithm, data
elements, allowable values, ICD-9-CM codes, medication tables, and risk adjustment), any updates
made to the measurement system core measure-related data collection tool must be proactively
shared with The Joint Commission for re-review. |
|
ATTRIBUTE 5: Technical Reporting Requirements |
|
5B The measurement system has successfully completed The Joint Commission’s current verification process for each
core/ core test measure set it intends to support. The intent of the verification process is to
establish that current core measure algorithms have been embedded by the system prior to offering
respective core measure sets to their clients.
|
Check out this link
Here is a test power point presentation
| I am Jen | |